The above structure is a geothermal powerplant main building. The structure was over 1500 metric tons. The Scope of work was to develop a 3d model of the geothermal powerplant which was further used for generating erection and shop drawings.
The Inputs we received were the structural drawings and connection details.
From the inputs received from the clients, we sorted all the essential details. A detailed analysis was done, and once this was completed, our team developed a plan of action for the projects.
Copyright © 2018 - Present. Extrude Structures - All Rights Reserved